

Apartment tower · 18 storeys
High-Rise Riser Failure
- Problem
- A failed riser joint below a mechanical room floor released water into suites and the corridor overnight.
- Work completed
- Water extracted suite by suite, wet drywall removed, structural drying across the affected floors, then corridor and suite rebuild.
- Verified outcome
- Daily readings recorded every suite at dry standard before rebuild, and the corridor was handed back with that record attached.






